Flazer Cardboard Factory
Construction of a high-pressure steam boiler system
The equipment needed for steam supply in this facility was purchased by the customer. However, these were not enough for the system to work completely safely and efficiently. In the previous project, the condensate returned from the production was discharged into the sewage system. This caused energy loss. By modifying the system, both efficient operation and energy efficiency were ensured. As a result, energy was saved by 55%.